EIPs Explained

ERC-6864 · Draft · ERC · 2023-04-05

ERC-6864: Upgradable Fungible Token

Draft ERC-20 extension that lets holders opt in to move balances from an existing token to a new upgraded token contract, and back, without proxies.

What problem does it solve?

Token contracts are immutable. If an ERC-20 has a bug, lacks a feature or must meet new rules, the usual fix is a proxy, but that only works if the token was deployed behind a proxy from day one. Proxy upgrades are also silent and one-way: holders can't refuse them.

ERC-6864 defines a simple upgrade path that works for any existing ERC-20. A new contract (the "ERC-6864 token") wraps a base ERC-20. Holders choose to upgrade by depositing base tokens, and can downgrade again later. Because the new contract is itself an ERC-20, integrators only need to change the address.

How it works

The interface extends IERC20 with:

  • baseToken(): address of the original ERC-20.
  • upgrade(to, amount): takes amount base tokens from the caller (who must have approved the new contract) and credits to with upgraded tokens. Emits Upgrade.
  • downgrade(from, to, amount): burns upgraded tokens from from (caller must be from or approved) and releases base tokens to to. Emits Downgrade.

The optional see-through extension adds combinedTotalSupply, combinedBalanceOf and combinedAllowance, which add up the base and upgraded amounts.

Notable design choices:

  • Reversible and nestable. Downgrading lets users exit a buggy version or switch between several ERC-6864 contracts built on the same base, and an upgraded token can itself be a base.
  • Upgrade-while-transfer. The reference implementation's transfer automatically upgrades any shortfall from the sender's base balance, and its balanceOf reports the combined balance.
  • The conversion rate is up to the implementation (1:1, linear or non-linear).

Compared with ERC-4931, which uses a separate bridge contract with pre-minted tokens, ERC-6864 mints just in time inside the token itself.

Sample code

A 1:1 implementation built on OpenZeppelin (simplified from the reference, without auto-upgrade):

// SPDX-License-Identifier: CC0-1.0
pragma solidity ^0.8.20;

import {IERC20, ERC20} from "@openzeppelin/contracts/token/ERC20/ERC20.sol";

contract UpgradedToken is ERC20 {
    event Upgrade(address indexed from, address indexed to, uint256 amount);
    event Downgrade(address indexed from, address indexed to, uint256 amount);

    IERC20 public immutable baseToken;

    constructor(address base) ERC20("Token v2", "TKN2") { baseToken = IERC20(base); }

    function upgrade(address to, uint256 amount) external {
        require(to != address(0), "zero to");
        require(baseToken.transferFrom(msg.sender, address(this), amount), "transfer failed");
        _mint(to, amount);
        emit Upgrade(msg.sender, to, amount);
    }

    function downgrade(address from, address to, uint256 amount) external {
        require(to != address(0), "zero to");
        if (from != msg.sender) _spendAllowance(from, msg.sender, amount);
        _burn(from, amount);
        require(baseToken.transfer(to, amount), "transfer failed");
        emit Downgrade(from, to, amount);
    }
}

Things to know

  • Status: Draft. Interfaces may change, and the reference code in the spec contains typos, so don't copy it verbatim.
  • Upgrading requires approve on the base token. Check the new contract and approve only what you intend to convert, since unlimited approvals combined with auto-upgrade in transfer remove that confirmation step.
  • If balanceOf / totalSupply return combined values, dashboards and indexers can double-count or disagree, especially with several or nested wrappers.
  • Non-linear conversion rates expose upgrades and downgrades to front-running and sandwich attacks, as with any AMM curve.

#token #erc20 #upgrade #migration #fungible

Details

Authors
Jeff Huang (@jeffishjeff)
Status
Draft
Type
Standards Track / ERC
Created
2023-04-05
Requires

Machine-readable: Markdown · JSON