EIP-1872 · Stagnant · Meta · 2018-03-25
EIP-1872: Ethereum Network Upgrade Windows
A stagnant process proposal to schedule Ethereum hard forks only in four fixed weeks per year, so exchanges, node operators and developers could plan around predictable upgrade windows.
What problem does it solve?
Ethereum network upgrades (hard forks) were scheduled case by case. Exchanges, infrastructure providers and node operators often learned the target date only weeks in advance, and dates moved when bugs appeared. That made it hard to plan maintenance, staffing and their own internal upgrades.
EIP-1872 proposed a calendar: a small set of known weeks when upgrades may happen, which also tells everyone when they won't.
How it works
Upgrades are split into three categories:
| Category | Purpose | Scheduling |
|---|---|---|
| Roadmap | Planned protocol improvements (e.g. Byzantium, Constantinople) | Only in the week containing the third Wednesday of January, April, July or October |
| Priority | Urgent but not systemic issues | Preferably an unused roadmap window; otherwise the third week of any month |
| Critical | Systemic risk (e.g. the DAO fork, Tangerine Whistle, Spurious Dragon) | Whenever needed; the EIP sets no restrictions |
Further rules:
- Roadmap upgrades pick a target window early. Client releases should be ready two to four weeks before, so the activation block is chosen four to six weeks before the window.
- Cadence should be a multiple of three months; not every window is used. A slipped upgrade moves to the next window.
- The activation block should be forecast to land near Wednesday 12:00 UTC of the window week.
- Block number style: mainnet and production networks use numbers ending in three or more zeros; testnets use base-10 palindromes, matching past practice.
- Critical upgrades should contain the minimum change needed, with other work deferred to regular upgrades.
Sample code
Computing the roadmap windows for a year (TypeScript):
/** Third Wednesday of the given month (UTC, month is 0-based). */
function thirdWednesday(year: number, month: number): Date {
const first = new Date(Date.UTC(year, month, 1, 12));
const offset = (3 - first.getUTCDay() + 7) % 7; // days until first Wednesday
return new Date(Date.UTC(year, month, 1 + offset + 14, 12));
}
const ROADMAP_MONTHS = [0, 3, 6, 9]; // Jan, Apr, Jul, Oct
for (const m of ROADMAP_MONTHS) {
const wed = thirdWednesday(2020, m);
const mon = new Date(wed.getTime() - 2 * 86_400_000);
const fri = new Date(wed.getTime() + 2 * 86_400_000);
console.log(wed.toISOString().slice(0, 10),
`${mon.toISOString().slice(0, 10)} to ${fri.toISOString().slice(0, 10)}`);
}
// 2020-01-15 2020-01-13 to 2020-01-17 (matches the table in the EIP)
Things to know
- Status is Stagnant. It never became the formal process, and Ethereum upgrades have continued to be scheduled individually by the core developers.
- The specific months and weeks were described as an initial suggestion open to change.
- It is a Meta EIP: it would change process, not the protocol, so no client code is involved.
- For the general rules on how proposals and hard forks are handled, see EIP-1 and the earlier process proposal EIP-233.